Charging points in Böblingen

Böblingen (Baden-Württemberg) has 67 charging points for electric cars with 243 connectors: 8 with direct current for fast charging, of which 6 of at least 100 kW. The lowest price we know is €0.48/kWh; for alternating current the typical price is €0.62/kWh.

Open the map of Böblingen with real-time availability

Charging points
67
Connectors
243
Fast DC charging
8
Open 24 hours
8
Minimum AC price
€0.49/kWh
Minimum DC price
€0.48/kWh
Minimum HPC price
€0.76/kWh

The cheapest charging points in Böblingen

Operator and addressPowerPrice
LidlRudolf-Diesel-Str. 550 kW DC2 connectors · T2, CCS€0.48/kWhdeclared priceMap
deerGraf-Zeppelin-Platz 122 kW AC2 connectors · T2, Schuko€0.49/kWhdeclared priceMap
Mercedes-BenzLeibnizstraße 6/122 kW AC4 connectors · T2€0.49/kWhdeclared priceMap
Mercedes-BenzLeibnizstraße 6/122 kW AC6 connectors · T2€0.49/kWhdeclared priceMap
Mercedes-BenzLeibnizstraße 6/122 kW AC6 connectors · T2€0.49/kWhdeclared priceMap
Mercedes-BenzLeibnizstraße 6/122 kW AC4 connectors · T2€0.49/kWhdeclared priceMap
Mercedes-BenzLeibnizstraße 6/122 kW AC2 connectors · T2€0.49/kWhdeclared priceMap
Mercedes- Benz NiederlassungWolf-Hirth-Straße 2822 kW AC2 connectors · T2€0.49/kWhdeclared priceMap
Mercedes- Benz NiederlassungWolf-Hirth-Straße 2822 kW AC2 connectors · T2€0.49/kWhdeclared priceMap
Mercedes- Benz NiederlassungWolf-Hirth-Straße 2822 kW AC2 connectors · T2€0.49/kWhdeclared priceMap
Mercedes- Benz NiederlassungWolf-Hirth-Straße 2822 kW AC2 connectors · T2€0.49/kWhdeclared priceMap
Mercedes- Benz NiederlassungWolf-Hirth-Straße 2822 kW AC2 connectors · T2€0.49/kWhdeclared priceMap

Fast direct-current charging

Operator and addressPowerPrice
LidlRudolf-Diesel-Str. 550 kW DC2 connectors · T2, CCS€0.48/kWhdeclared priceMap
AllegoHanns-Klemm-Straße 13150 kW DC2 connectors · CCS · 24h€0.76/kWhdeclared priceMap
Altro gestoreRudolf-Diesel-Straße 2062.5 kW DC1 connector · CCS, CHAdeMO€0.89/kWhdeclared priceMap

Operators in Böblingen

Nearby municipalities

The price shown is the lowest we know among those declared by operators to the national registry; it can change with time and length of stay.