Charging points in Tignale
Tignale (province of Brescia, Lombardia) has 6 charging points for electric cars with 14 connectors: 1 with direct current for fast charging, of which 1 of at least 100 kW. The lowest price we know is €0.61/kWh; for alternating current the typical price is €0.67/kWh.
Open the map of Tignale with real-time availability
- Charging points
- 6
- Connectors
- 14
- Fast DC charging
- 1
- Open 24 hours
- 6
- Minimum AC price
- €0.67/kWh
- Minimum HPC price
- €0.61/kWh
The cheapest charging points in Tignale
| Operator and address | Power | Price | |
|---|---|---|---|
| PlenitudeVia Campogrande | 110 kW DC3 connectors · CCS, T2 · 24h | €0.61/kWhwith Electroverse | Map |
| NeogyPiazza San Francesco d'Assisi | 22.1 kW AC2 connectors · T2 · 24h | €0.67/kWhwith Neogy (pagamento diretto QR) | Map |
| NeogyPiovere - Via San Marco | 22.1 kW AC2 connectors · T2 · 24h | €0.67/kWhwith Neogy (pagamento diretto QR) | Map |
| NeogyOldesio - Via UnitàD'Italia | 22.1 kW AC2 connectors · T2 · 24h | €0.67/kWhwith Neogy (pagamento diretto QR) | Map |
| NeogyVia San Pietro | 7.3 kW AC4 connectors · T2, T3A · 24h | €0.67/kWhwith Neogy (pagamento diretto QR) | Map |
| Go ElectricVia Unità D'Italia | 22 kW AC1 connector · T2 · 24h | €0.73/kWhwith Electroverse | Map |
Operators in Tignale
- Neogy 4 charging points
- Plenitude 1 charging point
- Go Electric 1 charging point
Nearby municipalities
- Brenzone sul Garda 6 charging points
- Tremosine sul Garda 11 charging points
- Gargnano 3 charging points
- Malcesine 9 charging points
- Limone sul Garda 10 charging points
- Toscolano-Maderno 6 charging points
- Costermano sul Garda 7 charging points
- Storo 3 charging points
- Ledro 4 charging points
- Gardone Riviera 13 charging points
The price shown is the lowest we know among the one reported by the operator to the PUN and those of charging apps; it can change with subscription, time and length of stay.