Charging points in Oberasbach
Oberasbach (Bayern) has 14 charging points for electric cars with 40 connectors: 3 with direct current for fast charging, of which 1 of at least 100 kW. The lowest price we know is €0.48/kWh; for alternating current the typical price is €0.52/kWh.
Open the map of Oberasbach with real-time availability
- Charging points
- 14
- Connectors
- 40
- Fast DC charging
- 3
- Open 24 hours
- 3
- Minimum AC price
- €0.52/kWh
- Minimum DC price
- €0.48/kWh
The cheapest charging points in Oberasbach
| Operator and address | Power | Price | |
|---|---|---|---|
| KauflandRothenburger Str. 70 | 50 kW DC2 connectors · T2, CCS, CHAdeMO | €0.48/kWhdeclared price | Map |
| N-ERGIEKurt-Schumacher-Str. 35 | 22 kW AC2 connectors · T2 | €0.52/kWhdeclared price | Map |
| N-ERGIEOberasbacher Straße 2 | 22 kW AC2 connectors · T2 | €0.52/kWhdeclared price | Map |
| N-ERGIESt.-Stephanus-Str. 1 | 22 kW AC2 connectors · T2 | €0.52/kWhdeclared price | Map |
| N-ERGIEAm Rathausplatz 1 | 22 kW AC6 connectors · T2 | €0.52/kWhdeclared price | Map |
| N-ERGIESteiner Straße 11 | 22 kW AC2 connectors · T2 | €0.52/kWhdeclared price | Map |
| N-ERGIENürnberger Straße 9 | 22 kW AC2 connectors · T2 | €0.52/kWhdeclared price | Map |
| Altro gestoreKarlstr. 11 | 22 kW AC2 connectors · T2 | €0.62/kWhdeclared price | Map |
| Altro gestoreStollberger Str. 0 | 22 kW AC2 connectors · T2 | €0.62/kWhdeclared price | Map |
| Altro gestoreJahnstr. 16 | 22 kW AC4 connectors · T2 | €0.62/kWhdeclared price | Map |
Operators in Oberasbach
- N-ERGIE 6 charging points
- Altro gestore 5 charging points
- EWE Go 1 charging point
- Kaufland 1 charging point
- ALDI 1 charging point
Nearby municipalities
- Zirndorf 20 charging points
- Stein 15 charging points
- Roßtal 7 charging points
- Fürth 144 charging points
- Cadolzburg 5 charging points
- Nürnberg 388 charging points
- Veitsbronn 6 charging points
- Rohr 5 charging points
- Schwabach 27 charging points
- Großhabersdorf 3 charging points
The price shown is the lowest we know among those declared by operators to the national registry; it can change with time and length of stay.