Charging points in Himmelkron
Himmelkron (Bayern) has 15 charging points for electric cars with 74 connectors: 10 with direct current for fast charging, of which 8 of at least 100 kW. The lowest price we know is €0.52/kWh; for alternating current the typical price is €0.52/kWh.
Open the map of Himmelkron with real-time availability
- Charging points
- 15
- Connectors
- 74
- Fast DC charging
- 10
- Open 24 hours
- 6
- Minimum AC price
- €0.52/kWh
- Minimum HPC price
- €0.72/kWh
The cheapest charging points in Himmelkron
| Operator and address | Power | Price | |
|---|---|---|---|
| N-ERGIEBernecker Str. 27 | 22 kW AC2 connectors · T2 | €0.52/kWhdeclared price | Map |
| Altro gestoreBahnhofstr. 32 | 11 kW AC4 connectors · T2 · 24h | €0.52/kWhdeclared price | Map |
| AllegoBayreuther Straße 3 | 22 kW AC2 connectors · T2 | €0.60/kWhdeclared price | Map |
| IonityHimmelkron 0 | 350 kW DC24 connectors · CCS · 24h | €0.72/kWhdeclared price | Map |
| AllegoBayreuther Straße 3 | 300 kW DC2 connectors · CCS | €0.76/kWhdeclared price | Map |
| AllegoBayreuther Straße 3 | 300 kW DC4 connectors · CCS | €0.76/kWhdeclared price | Map |
| AllegoBayreuther Straße 3 | 300 kW DC2 connectors · CCS | €0.76/kWhdeclared price | Map |
| EnBWKulmbacher Str. 1 | 100 kW DC4 connectors · CCS · 24h | €0.79/kWhdeclared price | Map |
| Aral pulseHofer Str. 2 | 300 kW DC8 connectors · CCS, CHAdeMO | €0.96/kWhdeclared price | Map |
Operators in Himmelkron
- Allego 5 charging points
- Altro gestore 5 charging points
- N-ERGIE 1 charging point
- Ionity 1 charging point
- Aral pulse 1 charging point
- EnBW 1 charging point
- EWE Go 1 charging point
Nearby municipalities
- Marktschorgast 3 charging points
- Bad Berneck i.Fichtelgebirge 4 charging points
- Neudrossenfeld 7 charging points
- Bindlach 7 charging points
- Kulmbach 27 charging points
- Gefrees 3 charging points
- Bayreuth 71 charging points
- Thurnau 6 charging points
- Bischofsgrün 4 charging points
- Warmensteinach 3 charging points
The price shown is the lowest we know among those declared by operators to the national registry; it can change with time and length of stay.