Charging points in Herzogenaurach

Herzogenaurach (Bayern) has 34 charging points for electric cars with 92 connectors: 6 with direct current for fast charging, of which 4 of at least 100 kW. The lowest price we know is €0.62/kWh; for alternating current the typical price is €0.62/kWh.

Open the map of Herzogenaurach with real-time availability

Charging points
34
Connectors
92
Fast DC charging
6
Open 24 hours
8
Minimum AC price
€0.62/kWh
Minimum DC price
€0.82/kWh
Minimum HPC price
€0.62/kWh

The cheapest charging points in Herzogenaurach

Operator and addressPowerPrice
Altro gestoreBeethovenstraße 6150 kW DC3 connectors · T2, CCS€0.62/kWhdeclared priceMap
Altro gestoreAn der Schütt 1022 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreTuchenbacher Straße 022 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreWerner-Heisenberg-Straße 1022 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreMünchener Straße 222 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreWürzburgerstraße 3522 kW AC4 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreSchulstraße 1722 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreMartin-Luther-Platz 522 kW AC4 connectors · T2 · 24h€0.62/kWhdeclared priceMap
Altro gestoreCarl-von-Ossietzky-Straße 722 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreAristide Briand Straße 1222 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreLion-Feuchtwanger-Straße 022 kW AC2 connectors · T2€0.62/kWhdeclared priceMap
Altro gestoreOlympiaring 322 kW AC2 connectors · T2€0.62/kWhdeclared priceMap

Fast direct-current charging

Operator and addressPowerPrice
Altro gestoreBeethovenstraße 6150 kW DC3 connectors · T2, CCS€0.62/kWhdeclared priceMap
Altro gestoreAdi-Dassler-Str. 093 kW DC2 connectors · CCS · 24h€0.82/kWhdeclared priceMap
Aral pulseOhmstr. 12300 kW DC4 connectors · CCS€0.96/kWhdeclared priceMap

Operators in Herzogenaurach

Nearby municipalities

The price shown is the lowest we know among those declared by operators to the national registry; it can change with time and length of stay.