Charging points in Waldshut-Tiengen
Waldshut-Tiengen (Baden-Württemberg) has 33 charging points for electric cars with 81 connectors: 10 with direct current for fast charging, of which 6 of at least 100 kW. The lowest price we know is €0.48/kWh; for alternating current the typical price is €0.61/kWh.
Open the map of Waldshut-Tiengen with real-time availability
- Charging points
- 33
- Connectors
- 81
- Fast DC charging
- 10
- Open 24 hours
- 5
- Minimum AC price
- €0.54/kWh
- Minimum DC price
- €0.48/kWh
- Minimum HPC price
- €0.76/kWh
The cheapest charging points in Waldshut-Tiengen
| Operator and address | Power | Price | |
|---|---|---|---|
| LidlHebelstr. 2 | 60 kW DC3 connectors · CCS, T2 | €0.48/kWhdeclared price | Map |
| KauflandBrückenstraße 7 | 50 kW DC2 connectors · T2, CCS, CHAdeMO | €0.48/kWhdeclared price | Map |
| Altro gestoreRheinbrückenstr. 6 | 22 kW AC2 connectors · T2 | €0.54/kWhdeclared price | Map |
| naturenergieNikolaus-Otto-Strasse 4 | 50 kW DC8 connectors · T2, Schuko, CCS, CHAdeMO · 24h | €0.61/kWhdeclared price | Map |
| naturenergiePeter-Thumb-Strasse 1 | 22 kW AC2 connectors · T2, Schuko | €0.61/kWhdeclared price | Map |
| naturenergieBismarckstrasse 7 | 22 kW AC2 connectors · T2, Schuko | €0.61/kWhdeclared price | Map |
| naturenergieWaldtorstrasse 1 | 22 kW AC2 connectors · T2, Schuko | €0.61/kWhdeclared price | Map |
| naturenergieAm Kaltenbach 10 | 22 kW AC2 connectors · T2 | €0.61/kWhdeclared price | Map |
| naturenergieLise-Meitner-Ring 8 | 22 kW AC2 connectors · T2 · 24h | €0.61/kWhdeclared price | Map |
| AllegoCarl-Duisburg-Straße 2 | 150 kW DC2 connectors · CCS | €0.76/kWhdeclared price | Map |
| naturenergieIndustriestraße 1 | 150 kW DC2 connectors · CCS | €0.79/kWhdeclared price | Map |
| naturenergieIndustriestraße 1 | 150 kW DC2 connectors · CCS | €0.79/kWhdeclared price | Map |
Fast direct-current charging
| Operator and address | Power | Price | |
|---|---|---|---|
| LidlHebelstr. 2 | 60 kW DC3 connectors · CCS, T2 | €0.48/kWhdeclared price | Map |
| KauflandBrückenstraße 7 | 50 kW DC2 connectors · T2, CCS, CHAdeMO | €0.48/kWhdeclared price | Map |
| naturenergieNikolaus-Otto-Strasse 4 | 50 kW DC8 connectors · T2, Schuko, CCS, CHAdeMO · 24h | €0.61/kWhdeclared price | Map |
| AllegoCarl-Duisburg-Straße 2 | 150 kW DC2 connectors · CCS | €0.76/kWhdeclared price | Map |
| naturenergieIndustriestraße 1 | 150 kW DC2 connectors · CCS | €0.79/kWhdeclared price | Map |
| naturenergieIndustriestraße 1 | 150 kW DC2 connectors · CCS | €0.79/kWhdeclared price | Map |
| naturenergieLise-Meitner-Ring 8 | 150 kW DC2 connectors · CCS · 24h | €0.79/kWhdeclared price | Map |
| naturenergieLise-Meitner-Ring 8 | 75 kW DC2 connectors · CCS · 24h | €0.79/kWhdeclared price | Map |
Operators in Waldshut-Tiengen
- Altro gestore 18 charging points
- naturenergie 12 charging points
- Allego 1 charging point
- Lidl 1 charging point
- Kaufland 1 charging point
Nearby municipalities
- Dogern 3 charging points
- Weilheim 6 charging points
- Lauchringen 8 charging points
- Albbruck 4 charging points
- Küssaberg 3 charging points
- Höchenschwand 6 charging points
- Laufenburg (Baden) 7 charging points
- Häusern 4 charging points
- Klettgau 4 charging points
- Murg 6 charging points
The price shown is the lowest we know among those declared by operators to the national registry; it can change with time and length of stay.